Preparation cement laying floors
Preliminary works
Includes all of the works of preparation of the support that must be carried out before the realisation of the waterproofing system.
They can be distinguished into works of completion and finishing. They are foreseen in all works where the realisation of a waterproofing system in necessary, with particular reference to covers.
- Incline masses (pdf, 749 KB).
- Preparation of the joints (pdf, 425 KB).
- Breakages, part 1 (pdf, 434 KB) and parte 2 (pdf, 404 KB).
- Rounding off of the internal and external edges (pdf, 226 KB).
Technical details
Given that it deals with those precautions that have to be adopted during the course of the realisation of the waterproofing.
The are the so called accessory works that include the works of contour or finishing and the application of the accessories.
Even this type of work, as that of the “preliminary works”, is very important for the functional purposes of the waterproofing system on a whole.
In the following documents please find images of example both for the contour works and the laying works of the accessories that can be downloaded in PDF format.
- Joint without insulation (pdf, 871 KB).
- Profiles with insulation (pdf, 964 KB) and without insulation (pdf, 760 KB).
- Aerators (pdf, 465 KB).
- Downspouts for rundown (pdf, 805 KB).
- Roofs with inclined surfaces (pdf, 458 KB).
- Threshold (pdf, 358 KB).
- Preliminary contours (pdf, 330 KB).
- Pipe unions for bitumen-polymer membranes: part 1 (pdf, 495 KB), part 2 (pdf, 562 KB) e part 3 (pdf, 608 KB).
Versione italiana


